Land Rover Discovery: Front Drive Halfshafts Outer Constant Velocity Joint Boot (G1794498)
READ NEXT:
SPECIAL TOOL(S)
REMOVA L
NOTE:
LH illustration shown, RH is similar.
Raise and support the vehicle using a suitable 2 post lift.
Refer to: Lifting (100-02 Jacking and Lifting, Description and
O
Installation
CAUTION:
Extreme cleanliness must be exercised when handling these
components.
Clean and inspect the components for deterioration.
NOTE:
Make sure a new retaining ring is to be installed.
SPECIAL TOOL(S)
ACTIVATION
CAUTIONS:
Make sure all the components are clean and free from corrosion.
Support the driveshaft at all times to prevent the damage to the
centre bearing.
NOTE:
T
SEE MORE:
Installation
Dress the flanges where necessary.
Offer up the new rear floor side extension and clamp into position.
Check alignment if correct, proceed to next step, if not, rectify and
recheck before proceeding.
NOTE:
Make sure the holes are drilled through the side member and
the rear floor
Installation
Dress the flanges where necessary.
Mark out the position on the new A-pillar outer panel where the
upper and lower Metal Inert Gas (MIG) welded butt joints are to be
made. Cut through the new panel as indicated.
Offer up the new A-pillar outer panel and clamp into position.