Land Rover Discovery: Battery and Charging System
READ NEXT:
REMOVAL
NOTE:
Removal steps in this procedure may contain installation details.
Disconnect the battery earth lead.
Refer to: Specifications (414-01 Battery, Mounting and Cables,
Specifications).
Refe
REMOVAL
NOTES:
Removal steps in this procedure may contain installation details.
Some variation in the illustrations may occur, but the essential
information is always correct.
If a new battery i
SEE MORE:
REMOVAL
NOTE:
Removal steps in this procedure may contain installation details.
Disconnect the battery earth lead.
Refer to: Specifications (414-01 Battery, Mounting and Cables,
Specifications).
Refer to: Plenum Chamber (412-01 Climate Control, Removal and
Installation).
Torque: 10 Nm
Torque: 1
All Gen 2.1 equipped vehicles are supplied with a USB map updates, these
updates can be performed by the customer.
The following process should be used to update the map data:
Start the engine.
Navigate to the TS Home Menu screen.
Insert the USB memory stick containing the map data into th