Land Rover Discovery: Battery and Charging System
READ NEXT:
REMOVAL
NOTE:
Removal steps in this procedure may contain installation details.
Disconnect the battery earth lead.
Refer to: Specifications (414-01 Battery, Mounting and Cables,
Specifications).
Refe
REMOVAL
NOTES:
Removal steps in this procedure may contain installation details.
Some variation in the illustrations may occur, but the essential
information is always correct.
If a new battery i
SEE MORE:
Installation
NOTE:
BSF installation involves using the Land Rover approved BSF
installation tool and requires a hole diameter of 6.5mm.
Dress flanges where necessary.
Clean and prepare the panel surfaces.
Clean out the threads on the captive nut inserts where the new roof
studs are to be
PRINCIPLES OF OPERATION
For a detailed description of the Starting System, refer to the relevant
Description and Operation section in the workshop manual. REFER to:
Starting System (303-06C Starting System - GTDi 2.0L Petrol/GTDi 2.0L
Petrol - SULEV, Description and Operation).
INSPECTION AND VERIFI