Land Rover Discovery Owners & Service Manuals

Land Rover Discovery: Battery and Charging System

READ NEXT:

 Auxiliary Battery (G1913471) / Removal and Installation

REMOVAL NOTE: Removal steps in this procedure may contain installation details. Disconnect the battery earth lead. Refer to: Specifications (414-01 Battery, Mounting and Cables, Specifications). Refe

 Battery (G1774714) / Removal and Installation

REMOVAL NOTES: Removal steps in this procedure may contain installation details. Some variation in the illustrations may occur, but the essential information is always correct. If a new battery i

 Battery Diagnostics

SEE MORE:

 Fuel Rail Pressure Control Valve (PCV)

The fuel rail Pressure Control Valve (PCV) is located in a threaded port in the rearward end of the fuel rail. The PCV regulates the fuel pressure within the fuel rail and is controlled by the ECM using Pulse Width Modulation (PWM) outputs to the solenoid valve. When the solenoid is de-energized

 Uni-body, Subframe and Mounting System Rear Subframe - AWD (G1779461) - Installation

Installation Torque: 9 Nm CAUTION: Make sure that new bolts are installed. Torque: Front bolts 175 Nm Rear blots 110 Nm CAUTIONS: Make sure that new nuts and bolts are installed. Nuts and bolts must be tightened with vehicle at normal ride height. Torque: Stage 1: 70 Nm Stage 2: 240º

© 2019-2026 Copyright www.lrdisc.com