Land Rover Discovery: Battery and Charging System
READ NEXT:
REMOVAL
NOTE:
Removal steps in this procedure may contain installation details.
Disconnect the battery earth lead.
Refer to: Specifications (414-01 Battery, Mounting and Cables,
Specifications).
Refe
REMOVAL
NOTES:
Removal steps in this procedure may contain installation details.
Some variation in the illustrations may occur, but the essential
information is always correct.
If a new battery i
SEE MORE:
PRINCIPLES OF OPERATION
For a detailed description of the Glass, Frames and Mechanisms, refer to
the relevant Description and Operation section in the workshop manual.
REFER to: Glass, Frames and Mechanisms (501-11 Glass, Frames and
Mechanisms, Description and Operation).
INSPECTION AND VERIFICATIO
BATTERY CARE REQUIREMENTS
4 . 1 RECEIPT OF A NEW VEHICLE
Within 72 hours of receipt of a new vehicle, a battery condition check must
be carried out in accordance with the battery test process utilizing a JLR
approved tester as outlined in the Equipment section (Section 5) of this
procedure.
NOTES