Land Rover Discovery Owners & Service Manuals

Land Rover Discovery: Battery and Charging System

READ NEXT:

 Auxiliary Battery (G1913471) / Removal and Installation

REMOVAL NOTE: Removal steps in this procedure may contain installation details. Disconnect the battery earth lead. Refer to: Specifications (414-01 Battery, Mounting and Cables, Specifications). Refe

 Battery (G1774714) / Removal and Installation

REMOVAL NOTES: Removal steps in this procedure may contain installation details. Some variation in the illustrations may occur, but the essential information is always correct. If a new battery i

 Battery Diagnostics

SEE MORE:

 Engine Speed and Torque Monitoring

The ECM constantly supplies the TCM with information on engine speed and torque through messages on the CAN powertrain systems bus. The TCM uses this information to calculate the correct and appropriate timing of shift changes. If the messages are not received from the ECM, the TCM will implement a

 Disposal of the Safety Belt Pretensioner

NOTE: Equipment required: Air bag deployment tools LRT-86-003, LRT-86- 003/08 and LRT-86-007/02 , Battery (12V), Safety goggles to BS2092 grade 2, Rubber gloves to PrEN 374 class 2, Ear protectors that have been measured to BS.EN 24869, Particulate respirator to EN 149 grade FFP2S. Using a suitabl

© 2019-2026 Copyright www.lrdisc.com