Land Rover Discovery: Front end Sheet Metal
Repairs
GALVANIC CORROSION
For additional information, refer to: Corrosion Protection (501-25B Body
Repairs - Corrosion Protection, Description and Operation).
FRONT END SERVICE PANELS
.19.jpg)
.20.jpg)
.21.jpg)
TIME SCHEDULES , FRONT END SERVICE PANELS
The following information shows the total time taken to install single panels.
These times do not include removal of mechanical, electrical and trim,
(MET), items or paint times.
The times shown are to be used as a guide only.
.22.jpg)
READ NEXT:
Removal
NOTE:
The suspension top mount is installed in conjunction with:
Front bumper cover
Front bumper
Hood
Hood latch panel
Front fender
Front fender splash shield
Fender apron panel
Fende
Installation
NOTE:
Make sure that the drilled out spot welds are installed with metal
inert gas (MIG) plug welds in the same quantities.
Using the old suspension top mount for reference prepare the
SEE MORE:
To start the vehicle using a starting aid or
a slave battery, follow the instructions in
the sequence given:
Connect the positive (Red) jump lead
to the positive (+) battery terminal of
the discharged battery.
Connect the negative (Black) jump lead
to the vehicle's earth point.
Switch on the
Removal
NOTE:
The inner quarter panel assembly is installed in conjunction with:
Rear bumper cover
Side panel
Quarter panel
Quarter panel lower extension
Fuel tank
Fuel tank filler pipe
Rocker panel
Roof rear panel
Roof panel
Glass roof panel
Rear subframe
Liftgate
The inner quart